SFCTA: Geary BRT Needs Center Bus Lanes

Go GearySFist had an excellent blog post yesterday about the SFCTA’s study of the proposed Geary Bus Rapid Transit project. In brief, the project team agrees with us that the dedicated bus lanes should run down the center of the street, in dedicated right of way, as most of SF’s light rail lines do (e.g. T-Third). The SFCTA also backed our call for a “rail ready” project that can be easily upgraded to light rail in the future, as funds become available.